I'm building my own RF target stand for practicing- in placing the red & green lights, are the red lights above the targets and the green below, or vice versa? I couldn't find it listed in the rules.
Thanks,
Ted
Rapid fire target specifications- are the red lights on top?
Moderators: pilkguns, m1963, David Levene, Spencer, Richard H
Forum rules
If you wish to make a donation to this forum's operation , it would be greatly appreciated.
https://www.paypal.com/paypalme/targettalk?yours=true
If you wish to make a donation to this forum's operation , it would be greatly appreciated.
https://www.paypal.com/paypalme/targettalk?yours=true
-
- Posts: 5617
- Joined: Mon Mar 01, 2004 12:49 pm
- Location: Ruislip, UK
After a thorough web search I've discovered that in the 2001 rules it was listed under 6.3.23.4 of the Technical Rules for all disciplines, and specified that the red light goes above the frame and the green light below. However, that rule doesn't exist in the current rules. Was it simply omitted by mistake, or is there a reason its no longer included?
Thanks,
Ted
Thanks,
Ted
-
- Posts: 5617
- Joined: Mon Mar 01, 2004 12:49 pm
- Location: Ruislip, UK
Just as common sense would indicate that the (obsolete) 2001 rule should continue to be used to give red above and green below for the 25m targets, I think that the same colour and positioning should apply to the 10m 5 target setup.TomF wrote:What about 5 falling plate targets? Where do the lights go?
As your question indicates however, that is not the complete answer to the problem. The rules give us no idea whether there shoud be one set of lights per target system or per target "diagram".
My personal preference would be for the latter, not because it would more closely resemble a 25m RF setup but because it offers the shooter various options on where to look while waiting for the green.
It is not a satisfactory situation though as the ISSF rules are supposed to give us a set of basic standards that we can expect wherever we shoot. Not giving guidance on simple target equipment construction/positioning is, IMHO, a major omission.